Castlefields Regeneration Environmental Improvement Works

Client: Halton Borough Council
Supervising Engineer: Halton Borough Council
Value: £510,000
Contract Duration: 7 months

Works Package

  • Filling in of two pedestrian subways beneath Runcorn Busway.
  • Construction of new pedestrian ‘At-Grade’ crossing points in lieu of subways.
  • Construction of graded footways / cycleways and ramps (compliant with the Disability Discrimination
    Act), incorporating new kerblines, asphalt surfacing, drop crossings and raised bus boarder kerbs.
  • Various landscaping works including tree felling.
  • Carriageway resurfacing and application of new road markings.
  • Installation of pedestrian guard railing and hand railings.

Hazards and Restrictions

  • Works subject to traffic and pedestrian management.
  • Sensitive operations to be carried out during off peak hours.
  • Maintaining both safe footpath and vehicular access throughout the works.
  • Various buried services along the length of the site.
  • Other demolition and construction works nearby.