Crow Trees Farm, Chatburn.

Client: Pringle Homes
Supervising Engineer: Elliot Burns

Contract Duration: 25 weeks

Works Package

  • Construction of roads & sewers to a new housing development in the village of Chatburn, Clitheroe.
  • Topsoil strip and stockpile on site.
  • Excavation of deep foul and surface water drainage in hard rock.
  • Construction of manhole access chambers with hydrobrake flow control.
  • Construction of stormwater attenuation tank 48m x 10m x 1.2m, excavation 3m deep in hard rock

Hazards and Restrictions

  • Works on busy construction site in rural village location
  • Maintain both safe footpath and vehicular access throughout the works for residents, deliveries, site staff and operatives
  • Deep excavations for drainage and stormwater tank. Safety fencing and signing to deep excavations
  • Working around various buried services in S278 work areas
  • Hard excavation in rock to deep drainage
  • Connection onto sewer in existing carriageway under traffic signal control and pedestrian diversion