Built on Expertise, Delivered with Precision
Accrington Town Centre
Highways & Environment Improvement
- Lancashire County Council
- £2,000,000
- 48 weeks
The scheme aims to improve the highways and pedestrian spaces and environment within the town centre focusing on Blackburn Road and the space in front of the Town Hall and Market Hall Footway construction works, incorporating new kerb lines, block paving, granite setts, Yorkstone paving, asphalt surfacing, drop crossings, raised bus stop access points and provision of level access thresholds
Crow Trees Farm, Chatburn
Roads & Sewers
- Pringle Homes
- 25 weeks
Construction of roads & sewers to a new housing development in the village of Chatburn, Clitheroe. Topsoil strip and stockpile on site. Excavation of deep foul and surface water drainage in hard rock. Construction of manhole access chambers with hydrobrake flow control. Construction of stormwater attenuation tank 48m x 10m x 1.2m, excavation 3m deep in hard rock Hazards and
A666 Lark Hill, Blackburn
Traffic Signal Junction Improvement
- Blackburn With Darwen Borough Council
- 16 weeks
Work includes highway & traffic signal junction improvements on A666 Lark Hill & Barbara Castle Way, Blackburn. Installation of numerous Traffic & Pedestrian Management set-ups which is in the form of road / footpath closures & diversions Take down existing pedestrian guardrail & installation of new guardrail. Realign kerblines and improve footways and pedestrian crossing islands. Installation of new traffic
Lytham Road, Warton
S278 Work A584
- Lancashire County Council
- £1.2m
- 28 weeks
The works are the construction of a widened four arm traffic signal controlled junction with new pedestrian islands & encompass the following: Excavation of existing footpaths to allow new carriageway narrow widening construction CCTV survey of existing drainage & installation of new carriageway drainage and access chambers New kerb alignment and construction of pedestrian crossing islands Supply and installation of