Works Package
- Footway construction works, incorporating new kerblines, block paving, asphalt surfacing, drop crossings, raised bus stop access points and provision of level access thresholds to shops.
- Carriageway reconstruction, realignment and resurfacing works with the application of new road markings.
- Installation of new controlled pedestrian crossings and traffic signal junctions.
- Placement of ornate street furniture, including: bus shelters, cycle stands, seating, litter bins, lighting columns, pedestrian guard-railing, trees and tree furniture.
- Installation of various traffic calming measures, including raised plateaus, road narrowings and a new one-way system.
- Various drainage and ducting works comprising ACO linear drainage kerbs & channels, new gullys, replacement ironwork, ducting for street
lighting, traffic signals and proposed CCTV system.

Hazards and Restrictions
- Works subject to traffic and pedestrian management.
- Sensitive operations to be carried out during off peak hours.
- Maintaining both safe footpath and vehicular access throughout the works.
- Various buried services along the length of the site.
- Length of works to be opened up at any one time restricted.
- Confined spaces working.