{"id":2014,"date":"2025-08-26T12:24:29","date_gmt":"2025-08-26T12:24:29","guid":{"rendered":"http:\/\/www.nmsltd.co.uk\/?p=2014"},"modified":"2025-09-05T14:20:31","modified_gmt":"2025-09-05T14:20:31","slug":"nms-civil-engineering-complete-works-on-a666-lark-hill-traffic-signal-junction-improvements-in-blackburn","status":"publish","type":"post","link":"https:\/\/www.nmsltd.co.uk\/index.php\/2025\/08\/26\/nms-civil-engineering-complete-works-on-a666-lark-hill-traffic-signal-junction-improvements-in-blackburn\/","title":{"rendered":"Works completed on A666 Lark Hill Traffic Signal Junction Improvements in Blackburn"},"content":{"rendered":"\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>Works completed for Blackburn with Darwen Borough Council on the A666 Barbara Castle Way junction Lark Hill on the busy periphery of Blackburn Town Centre. The key objectives to improve the flow of traffic and minimise congestion for all road users with additional measures to reduce the journey time of buses to and from Blackburn Bus Station. To encourage sustainable transport uptake, particular cycling and walking incorporating shared use facilities through the junction.<\/p>\n<\/div>\n<\/div>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"1966\" src=\"http:\/\/www.nmsltd.co.uk\/wp-content\/uploads\/2025\/08\/P1000528-1024x683.jpg\" alt=\"\" class=\"wp-image-1966\" srcset=\"https:\/\/www.nmsltd.co.uk\/wp-content\/uploads\/2025\/08\/P1000528-1024x683.jpg 1024w, https:\/\/www.nmsltd.co.uk\/wp-content\/uploads\/2025\/08\/P1000528-300x200.jpg 300w, https:\/\/www.nmsltd.co.uk\/wp-content\/uploads\/2025\/08\/P1000528-768x512.jpg 768w, https:\/\/www.nmsltd.co.uk\/wp-content\/uploads\/2025\/08\/P1000528-1536x1025.jpg 1536w, https:\/\/www.nmsltd.co.uk\/wp-content\/uploads\/2025\/08\/P1000528-2048x1367.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">A666 Lark Hill Traffic Signal Junction Improvements, Blackburn<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<p>Work consisted of footway improvement and re-surfacing including replacement and realign the kerbs to pedestrian crossing islands. Removal of existing traffic signals, traffic signs, pedestrian guardrail and replacement with new. Planing and resurfacing carriageway along with new road markings.<\/p>\n\n\n\n<p>NMS Civil Engineering is an established contractor based in North West England who have over 30 years of experience. We offer a range of services including Civils, Planning, Barriers, and Recycling from our on-site facility. If you would like any more information please email us&nbsp;<a href=\"mailto:info@nmsltd.co.uk?Subject=Enquiry\">info@nmsltd.co.uk<\/a>&nbsp;or call us on&nbsp;01942 772694.<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Works completed for Blackburn with Darwen Borough Council on the A666 Barbara Castle Way junction Lark Hill on the busy periphery of Blackburn Town Centre.<\/p>\n","protected":false},"author":3,"featured_media":2032,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[12],"tags":[],"class_list":["post-2014","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.nmsltd.co.uk\/index.php\/wp-json\/wp\/v2\/posts\/2014","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nmsltd.co.uk\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nmsltd.co.uk\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nmsltd.co.uk\/index.php\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nmsltd.co.uk\/index.php\/wp-json\/wp\/v2\/comments?post=2014"}],"version-history":[{"count":12,"href":"https:\/\/www.nmsltd.co.uk\/index.php\/wp-json\/wp\/v2\/posts\/2014\/revisions"}],"predecessor-version":[{"id":2102,"href":"https:\/\/www.nmsltd.co.uk\/index.php\/wp-json\/wp\/v2\/posts\/2014\/revisions\/2102"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nmsltd.co.uk\/index.php\/wp-json\/wp\/v2\/media\/2032"}],"wp:attachment":[{"href":"https:\/\/www.nmsltd.co.uk\/index.php\/wp-json\/wp\/v2\/media?parent=2014"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nmsltd.co.uk\/index.php\/wp-json\/wp\/v2\/categories?post=2014"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nmsltd.co.uk\/index.php\/wp-json\/wp\/v2\/tags?post=2014"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}