Recycling

Get in touch

NMS Recycling

NMS take pride in producing consistently high quality RAP on our own site which meets current regulations and is available at a very competitive rate.

When choosing where to purchase recycled asphalt paving (RAP), it is important to find a reputable supplier as it should conform to sizing and screening standards. Our RAP can be produced to your requirements and supplied in the quantities that you need. It is available for delivery or collection from our site at junction 24 on the M6. For further information and prices, please call 01942 722694 or email info@nmsltd.co.uk


The History of NMS & Recycling

NMS pioneered the use of recycled planings into asphalt plants in the late 90s.

Peter Botterill still holds the Patent for bitumen sand. Unfortunately, the technology at the asphalt plants was not advanced enough for the product at that time and resulted in that part of the business being sold to Hanson.
In 1998 when the first loads of bitumen sand were delivered the expectation was to use 5 to 10 % in new surfacing. With modern methods of asphalt production and quality control of the RAP (recycled asphalt pavement), that aspiration has risen to over 50%.

We are now supplying crushed and graded planings (RAP) to 3 of the major players in the asphalt industry. NMS have with the co-operation and help of Balfour Beatty created a WRAP ((Waste & Resources Action Programme) Quality Protocol. This enables us to deal with waste at source. Once the waste surfacing/road has been loaded onto our disposal wagons the waste is already a product. This product can then be transported direct to the final customer. Environment Agency T5 exemptions for sites are obtained and as a consequence, we do not operate under waste transfer regulations resulting in a substantial reduction in our Clients carbon footprint. The concept of the linear quarry is now a realistic proposition.

Since 2013 most of the product we produce with our modern fleet of Wirtgen planers is transferred to our production centre close to Junction 24 of the M6. We select only the bitumen rich upper layers of the carriageway and transport to the production site for further enhancement into RAP. These bitumen rich products come primarily from Motorway and A roads within the Area 10 motorway network. The Specification for these roads has remained known for the past 40 years and as such we can predict the bitumen content of the resulting product with a large degree of accuracy. Work on the network is carried out almost exclusively overnight and our production site is ideally placed to accommodate the work.

Very occasionally we encounter Tar during our planing operations. Our operatives are trained to identify the problem and to confirm it with a PAK spray. Tar can become a major issue particularly if we are not aware of the problem before we get to the site. We now have obtained an S2 exemption to store up to 500 tonnes of Tar bound planings in a dedicated area at our Junction 24 facility. This gives ourselves and our clients the option to ensure that progress on the resurfacing site is not compromised. We will of course be operating under waste transfer and waste management regulations once Tar is encountered. A hazardous waste consignment note will accompany each load of road planings containing coal tar (assuming that the coal tar content is >0.1%).


Latest Case Studies
Accrington Town Centre
Highways & Environment Improvement
The scheme aims to improve the highways and pedestrian spaces and environment within the town centre focusing on Blackburn Road and the space in front of the Town Hall and Market Hall Footway construction works, incorporating new kerb lines, block paving, granite setts, Yorkstone paving, asphalt surfacing, drop crossings, raised bus stop access points and provision of level access thresholds
Find Out More
Crow Trees Farm, Chatburn
Roads & Sewers
Construction of roads & sewers to a new housing development in the village of Chatburn, Clitheroe. Topsoil strip and stockpile on site. Excavation of deep foul and surface water drainage in hard rock. Construction of manhole access chambers with hydrobrake flow control. Construction of stormwater attenuation tank 48m x 10m x 1.2m, excavation 3m deep in hard rock Hazards and
Find Out More
A666 Lark Hill, Blackburn
Traffic Signal Junction Improvement
Work includes highway & traffic signal junction improvements on A666 Lark Hill & Barbara Castle Way, Blackburn. Installation of numerous Traffic & Pedestrian Management set-ups which is in the form of road / footpath closures & diversions Take down existing pedestrian guardrail & installation of new guardrail. Realign kerblines and improve footways and pedestrian crossing islands. Installation of new traffic
Find Out More

DISCOVER THE NMS SERVICES
New signal junction on Lytham Road, Warton
Building and maintaining the North West’s highway network through expertise, collaboration and innovation.
Find Out More